IGD II – 11 PARs & 5 PAUs

• Structural Steel - 3,000 MT

• Structure & Pipe Support - 150 MT

• Gratings - 4,500 SQM

• Fabrication of Piping - 35,952 Inch Dia

• Assembly of Piping - 6,216 Inch Dia

• Flange Connection Joints - 621 nos.

• Handling of Pipes - 99,000 Inch Meter

• Equipment - 132 MT

• Painting - 11,000 SQM

• Fire proofing - 5,850 SQM

• Insulation - 7,477 M

• Electrical Cable Laying - 18,809 M

• Installation of Lighting Fixture - 329 Nos

• DB & JB - 50 Nos.

• Instrumentation Tagged Items - 123 Nos.

• Cable Tray - 10,068 M

• Shipping Readiness

• SHIPPING READINESS FINAL WEIGHT: 6,381 MT